701 acres. Built to manufacture.

The LAMP campus in Liberty County, Texas is being developed for advanced manufacturing and power.

The building from high above, with a pond and rows of containersThe LAMP site, October 2026

701acres in one master-planned campus

19parcels marketed by JLL

4M SFof space through JLL

Up to 3 GW Projectedlong-term planned capacity

The campus

About LAMP

LAMP (Liberty Advanced Manufacturing and Power) is a 701-acre advanced manufacturing and power campus in Liberty County, Texas. It is designed for advanced technology, energy, and industries that need reliable infrastructure and reliable power.

LAMP is being developed around a dedicated energy strategy, transportation access, and long-term industrial growth. With access to major highways, rail, and the greater Houston region, the campus is positioned to support industries that matter to American manufacturing and supply chain resilience.

LAMP is designed for companies in advanced materials, rare earth magnet manufacturing, robotics, autonomous systems, precision manufacturing, additive manufacturing, energy technologies, and other high-value industrial sectors. The goal is simple: a place where American industry can build, innovate, and grow for generations.

Rendering of the completed LAMP campus from the air: buildings with solar roofs, two solar fields, and the highway along the southern edgeRendering

Three zones, nineteen parcels

The 550 acres JLL markets are laid out in three zones. Each parcel is offered on ground lease or build-to-suit.

TEC-1TEC-2TEC-3TEC-4MFG-2MFG-1MFG-3MFG-4MFG-512345678910Solar fieldSolar fieldFuture expansionFuture expansionWater capture and treatmentRail lineU.S. Highway 90Four advanced technology parcels on the west side, five advanced manufacturing parcels in the middle, ten industrial and support parcels below them, two solar fields to the north, water capture and treatment in the south-east corner, and the rail line and Highway 90 along the southern edge.
  • Advanced technology zone4 parcels, 217 acres, 1,585,000 SF of building potential
  • Advanced manufacturing zone5 parcels, 193 acres, 1,390,000 SF of building potential
  • Industrial and support10 parcels, 140 acres, 1,025,000 SF of building potential

Power infrastructure

Manufacturing at this scale requires reliable power. The LAMP energy plan is built around that requirement.

LAMP is planned behind the meter: on-site generation serves its main operations, which limits additional demand on the regional grid. Liberty County is in the MISO South power market.

240 MW Projectedin 2027

Up to 3 GW Projectedlong-term planned capacity

  1. Phase 1

    60MW Projected

    Initial deployment

    Target online October 2026

    Natural gas generation in a combined-cycle configuration.

    Planned

  2. Phase 2

    240MW Projected

    Expansion

    Target online 2027

    Additional natural gas generation plus infrastructure.

    Planned

  3. Phase 3

    600–1,000MW+ Projected

    Scale-up

    Target online 2028 to 2030

    Further expansion and additional capacity.

    Long-term capacity

  4. Phase 4

    Up to 3GW

    Campus buildout

    Target online 2030 and beyond

    Long-term planned capacity is up to 3 GW.

    Long-term capacity

Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments.

Behind the meter, from fuel to tenant

  1. Natural gas supply
  2. Power plants
  3. Substations
  4. Campus distribution network
  5. Tenant facilities and common infrastructure

Planned capacity and status

The power plan phase by phase, with its status as LAMP publishes it. Planned capacity is a projection; firm capacity is what a signed agreement commits.

PhasePlanned capacity, campus totalTargetStatusFirm capacity
Phase 160 MW ProjectedOctober 2026PlannedSet in a signed agreement
Phase 2240 MW Projected2027PlannedSet in a signed agreement
Phase 3600 to 1,000 MW or more Projected2028 to 2030Long-term capacitySet in a signed agreement
Phase 4Up to 3 GW Projected2030 and beyondLong-term capacitySet in a signed agreement

Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments. Every figure here is planned capacity, a projection from current plans. Firm capacity, allocation and dates are set only in a signed agreement, after a technical review.

Two Phase 1 dates, two milestones

  1. October 2026

    First power

    The first 60 MW of power is targeted from October 2026.

  2. December 2026

    All Phase 1 works

    All Phase 1 site, building and utility works are targeted for completion in December 2026.

The two dates are different milestones. Both are targets.

LAMP Texas

Phase 1 power status report

60 MW, planned behind the meter

Report date
No stage date published yet
Basis
Information published by LAMP and JLL
Status
Planned

Current energization target

October 2026 (target). The first 60 MW of power is targeted from October 2026.

Completed

  • Load flow and short circuit analysis completed

Stage dates not yet published

  • Equipment procured
  • Delivered
  • Installed
  • Commissioning
  • Tested
  • Operational

Design basis, verified at commissioning

  • N+1 redundancy
  • Island-mode capable
  • Black-start capable
  • 99.999% reliability target

Grid and fuel

  • Existing 138 kV transmission, about 1.15 miles from the campus
  • 345 kV interconnection capability planned
  • 30-inch natural gas pipeline adjacent to the campus
  • 30,000 MMBtu a day of initial delivery capacity

Each stage shows its date once it is verified.

Stage by stage

The date each phase reached each stage, as LAMP publishes it once the stage is verified.

Last update No stage date published yet

  1. Phase 160 MW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  2. Phase 2240 MW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  3. Phase 3600 to 1,000 MW or more Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  4. Phase 4Up to 3 GW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published

Fuel supply, phase by phase

Natural gas is the fuel of the first phases. The supply in place today, and the plan for each later phase as it is approved.

30-inchnatural gas pipeline adjacent to the campus

30,000MMBtu a day of initial delivery capacity

  1. Pipeline
  2. Delivery point
  3. On-site generation
  4. Campus distribution
  5. Tenant facilities
  • Delivery point adjacent to the campus
  • Redundant supply options available
  • Dual gas supply paths, with on-site storage options
PhasePlanned capacity, campus totalFuel supply planContracted delivery
Phase 160 MWPublished once approvedPublished once approved
Phase 2240 MWPublished once approvedPublished once approved
Phase 3600 to 1,000 MW or morePublished once approvedPublished once approved
Phase 4Up to 3 GWPublished once approvedPublished once approved

The fuel supply of each later phase is published once its plan is approved. Contracted volumes, redundancy and added pipeline capacity are confirmed in the technical review of each phase.

Infrastructure planned first

What the campus plans for every company on it, and what is built so far.

Solar panels beside a concrete pad on the LAMP site, seen from above

Power

Planned behind the meter. Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030.

Two white water storage tanks on the LAMP site, with a steel building frame behind them

Water storage

More than 50 million gallons of planned water storage. The main bodies of two steel water tanks were completed in July 2026.

A retention pond on the LAMP site, seen from above

Rainwater and detention

Detention ponds and rainwater capture are part of the water plan, with on-site treatment and reuse.

Rows of green and red containers on the site

Rail and roads

A rail spur connects to the nearby Union Pacific line. Trucks reach the campus by FM 2830 and State Highway 770.

Fiber

Fiber runs through the south entrance today. Northern and western entrances are planned.

Cooling

Air-cooled, closed-loop and hybrid cooling are in the plans, with liquid cooling as a future option.

Site conditions

Flood Zone X, minimal risk. Designed for 140+ mph winds. A low seismic risk area.

The LAMP site in Liberty County seen from the air, with earthworks, foundations and rows of containersThe LAMP site, October 2026

From site control to operations

A facility is targeted to be ready for service 10 to 14 months after site control, in seven steps.

10–14months, targeted

  1. 01

    Site control

    Completed

  2. 02

    Design

    2 to 3 months

  3. 03

    Permitting

    2 to 3 months

  4. 04

    Infrastructure enabling works

    2 to 4 months

  5. 05

    Build

    3 to 6 months

  6. 06

    Commission and turn-up

    1 to 2 months

  7. 07

    Operations

    Ready for service

Construction progress

Follow the latest construction milestones, infrastructure improvements, and development activity across the campus.

Photos as of October 2, 2026

Why advanced manufacturing

The United States has spent the last several decades watching critical manufacturing capacity move offshore: rare earth magnets, precision components, defense-adjacent supply chains.

LAMP is planned as one answer: a domestic, integrated campus for producing critical components, in a county with the land, the infrastructure, and the workforce to support it. Construction is under way, and all Phase 1 site, building and utility works are targeted for completion in December 2026.

What comes next

Phase 1 is the foundation. The campus has been planned with full buildout in mind, and the infrastructure decisions being made now reflect that longer horizon.

As tenants confirm, as construction milestones are reached, and as jobs are filled, we will update this page with specifics. That is our commitment to Liberty County: no overpromising, and no surprises when the facts are in hand.

Rendering for reference only. Final design, features and specifications subject to change.

Development update: the proposed MAA plant

The proposed 7,000 metric tons a year methacrylic acid (MAA) facility is planned for the campus. The renderings show the current conceptual design.

Rendering for reference only. Final design, features and specifications subject to change.

Conceptual rendering of the proposed MAA plant, view 2Rendering

Find your site on the campus

Land, power, water, logistics, fiber and people are planned together, so that a company can build on infrastructure that is already in the plan.

TBD / Future Industry

Square Footage: 250,000 sq ft

RENDERING FOR REFERENCE ONLY

Function:
Future manufacturing opportunity
Description:

Reserved for future industrial partners seeking access to LAMP Texas infrastructure, power, water planning, logistics, and manufacturing ecosystem.

Rocket / Machine Parts Manufacturing

Aerospace and precision component manufacturing
Industrial building with loading docks
RENDERING FOR REFERENCE ONLY
Function:
Aerospace and precision component manufacturing
Description:
Produces precision parts for rocket systems, aerospace equipment, propulsion components, and industrial machinery.
Why it matters at LAMP:
Requires reliable power, controlled production environments, and advanced machining support.

Drone Manufacturing

UAV and defense-focused manufacturing

RENDERING FOR REFERENCE ONLY

Function:
UAV and defense-focused manufacturing
Description:
Supports production of drone systems, components, frames, electronics, and mission-ready platforms.
Why it matters at LAMP:

Benefits from nearby machining, 3D printing, power infrastructure, and secure industrial operations.

3D Printing

Bio-based Methacrylic Acid manufacturing

RENDERING FOR REFERENCE ONLY

Function:
Advanced additive manufacturing
Description:
Supports rapid prototyping, component production, tooling, and industrial part development.
Why it matters at LAMP:
Allows faster design-to-production cycles for other campus industries.

Spin Energy Storage

Mechanical energy storage

RENDERING FOR REFERENCE ONLY

Function:
Mechanical energy storage
Description:
Stores kinetic energy through a rotating mass and releases power quickly when needed.
Why it matters at LAMP:
Helps stabilize campus power and supports energy-intensive manufacturing operations.

Neodyte Rare Earth Permanent Magnets

Permanent magnet manufacturing

RENDERING FOR REFERENCE ONLY

Function:
Permanent magnet manufacturing
Description:
Produces high-performance magnets used in EVs, wind turbines, robotics, defense, and advanced electronics.
Why it matters at LAMP:
Supports U.S. supply chain resilience and benefits from stable on-site power and nearby advanced manufacturing.

MAA Plant

Bio-based Methacrylic Acid manufacturing
MAA

RENDERING FOR REFERENCE ONLY

Function:
Bio-based Methacrylic Acid manufacturing
Description:
Produces Methacrylic Acid used in adhesives, coatings, medical plastics, automotive materials, and construction products.
Why it matters at LAMP:
Benefits from on-site power, integrated utilities, logistics access, and shared industrial infrastructure.