Workers finishing a round concrete foundation at sunset on the LAMP site, with concrete trucks behind them

Will your facility fit at LAMP?

Tell us what your plant needs: power, land, building space, water, logistics and timing. The site selection assistant compares it, line by line, with the planned capacity of LAMP, a 701-acre advanced manufacturing and power campus in Liberty County, Texas, and you can send the result to the LAMP team.

701acres in Liberty County, Texas

550acres marketed by JLL, on 19 parcels

60 MW Projectedof power from October 2026

Dec 2026Phase 1 target

The site selection assistant

Enter what you know. Every answer is optional, and the analysis updates as you type.

Your industry
Power
Land and building
Water
Cooling
Logistics
Start of operations

How LAMP answers

Enter at least one requirement to see how LAMP answers it.

Nothing entered yet

    Planned power and your load, by year

    A first look, not an offer: the assistant uses LAMP's current plans and targets, which can change, and every point is confirmed with the LAMP team and JLL in a commercial and technical review.

    Planned capacity and status

    The power plan phase by phase, with its status as LAMP publishes it. Planned capacity is a projection; firm capacity is what a signed agreement commits.

    PhasePlanned capacity, campus totalTargetStatusFirm capacity
    Phase 160 MW ProjectedOctober 2026PlannedSet in a signed agreement
    Phase 2240 MW Projected2027PlannedSet in a signed agreement
    Phase 3600 to 1,000 MW or more Projected2028 to 2030Long-term capacitySet in a signed agreement
    Phase 4Up to 3 GW Projected2030 and beyondLong-term capacitySet in a signed agreement

    Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments. Every figure here is planned capacity, a projection from current plans. Firm capacity, allocation and dates are set only in a signed agreement, after a technical review.

    Two Phase 1 dates, two milestones

    1. October 2026

      First power

      The first 60 MW of power is targeted from October 2026.

    2. December 2026

      All Phase 1 works

      All Phase 1 site, building and utility works are targeted for completion in December 2026.

    The two dates are different milestones. Both are targets.

    LAMP Texas

    Phase 1 power status report

    60 MW, planned behind the meter

    Report date
    No stage date published yet
    Basis
    Information published by LAMP and JLL
    Status
    Planned

    Current energization target

    October 2026 (target). The first 60 MW of power is targeted from October 2026.

    Completed

    • Load flow and short circuit analysis completed

    Stage dates not yet published

    • Equipment procured
    • Delivered
    • Installed
    • Commissioning
    • Tested
    • Operational

    Design basis, verified at commissioning

    • N+1 redundancy
    • Island-mode capable
    • Black-start capable
    • 99.999% reliability target

    Grid and fuel

    • Existing 138 kV transmission, about 1.15 miles from the campus
    • 345 kV interconnection capability planned
    • 30-inch natural gas pipeline adjacent to the campus
    • 30,000 MMBtu a day of initial delivery capacity

    Each stage shows its date once it is verified.

    Stage by stage

    The date each phase reached each stage, as LAMP publishes it once the stage is verified.

    Last update No stage date published yet

    1. Phase 160 MW Projected

      1. Equipment procuredNot yet published
      2. DeliveredNot yet published
      3. InstalledNot yet published
      4. CommissioningNot yet published
      5. TestedNot yet published
      6. OperationalNot yet published
    2. Phase 2240 MW Projected

      1. Equipment procuredNot yet published
      2. DeliveredNot yet published
      3. InstalledNot yet published
      4. CommissioningNot yet published
      5. TestedNot yet published
      6. OperationalNot yet published
    3. Phase 3600 to 1,000 MW or more Projected

      1. Equipment procuredNot yet published
      2. DeliveredNot yet published
      3. InstalledNot yet published
      4. CommissioningNot yet published
      5. TestedNot yet published
      6. OperationalNot yet published
    4. Phase 4Up to 3 GW Projected

      1. Equipment procuredNot yet published
      2. DeliveredNot yet published
      3. InstalledNot yet published
      4. CommissioningNot yet published
      5. TestedNot yet published
      6. OperationalNot yet published

    The site, layer by layer

    What stands behind every answer of the assistant: the land, the power, the water, the logistics and the timing, on the site plan of the campus.

    SSSTEC-1TEC-2TEC-3TEC-4MFG-2MFG-1MFG-3MFG-4MFG-512345678910Solar fieldSolar fieldFuture expansionFuture expansionWater capture and treatmentRail lineU.S. Highway 90Generation plantFuture generationUtility interconnection345 kV, plannedFour advanced technology parcels on the west side, five advanced manufacturing parcels in the middle, ten industrial and support parcels below them, two solar fields to the north, water capture and treatment in the south-east corner, and the rail line and Highway 90 along the southern edge.
    • Advanced technology zone
    • Advanced manufacturing zone
    • Industrial and support
    • Q4 2026
    • Q1 2027
    • Q2 2027

    Earliest delivery of the parcels

    The plan is an illustration. It is not to scale, and areas are approximate.

    1. The land of the future campus before construction, seen from the air

      Land and buildings

      550 acreson 19 parcels of about 14 to 77 acres

      Of the campus's 701 acres, JLL has exclusive rights to 550 acres and 4 million square feet of space.

    2. Solar panels beside a concrete pad on the LAMP site, seen from above

      Power by phase

      Up to 3 GW Projectedlong-term planned capacity

      Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030. Long-term planned capacity is up to 3 GW.

    3. Rendering of the completed campus from the air, with solar panels on the roofs and in the fieldsRendering

      Behind the meter

      MISO Souththe power market of Liberty County

      LAMP is planned behind the meter: on-site generation serves its main operations, which limits additional demand on the regional grid. Liberty County is in the MISO South power market.

    4. White water storage tanks with dark domed roofs

      Water

      50 million+gallons of planned water storage

      More than 50 million gallons of planned water storage, with detention ponds and rainwater capture.

    5. Rows of green and red containers on the site

      Rail, road and port

      40 minutesfrom downtown Houston

      A rail spur connects to the nearby Union Pacific line. Trucks reach the campus by FM 2830 and State Highway 770. About 40 minutes from downtown Houston, within reach of Port Houston and George Bush Intercontinental Airport.

    6. Earthworks and equipment beside the building, seen from the airOctober 2026

      Timing

      Dec 2026Phase 1 target

      All Phase 1 site, building and utility works are targeted for completion in December 2026. The campus is planned in 6 phases.

    How the campus connects

    A rail spur at the site, highways to Houston, and Port Houston and George Bush Intercontinental Airport within reach.

    • A rail spur connects to the nearby Union Pacific line.

    • Trucks reach the campus by FM 2830 and State Highway 770, routed away from residential streets.

    • About 40 minutes from downtown Houston, within reach of Port Houston and George Bush Intercontinental Airport.

    LAMP campusDowntown Houstonabout 40 minutesGeorge Bush Intercontinental AirportPort HoustonUnion Pacific
    Approximate positions; the routes are drawn as a diagram.

    Construction progress

    Follow the latest construction milestones, infrastructure improvements, and development activity across the campus.

    Photos as of October 2, 2026

    Ways to work with LAMP

    LAMP works with manufacturers, technology and research partners, suppliers and investors who want to build in Texas for the long term.

    Build a facility

    Lease a site or ask for a build-to-suit facility on one of 19 parcels, marketed by JLL.

    Leasing with JLL

    Bring a technology

    Companies whose technology could serve the campus or the companies on it, in energy, water, automation or materials.

    Start a conversation

    Research and training

    Universities, institutes and training providers working on programs, pilot lines and the skills of the region.

    Start a conversation

    Supply and build

    Suppliers and contractors register in LAMP's vendor portal and answer open requests.

    Vendor opportunities

    Invest

    Investors and lenders can request information about LAMP.

    Information for investors

    Questions and answers

    Leasing with JLL
    What does the assistant need from me?

    Only what you know. Every answer is optional, and nothing is sent until you send the form.

    Is the result an offer?

    No. It is a first look from LAMP's current plans and targets. Every point is confirmed with the LAMP team and JLL in a commercial and technical review.

    How much power is available, and when?

    Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030.

    Who answers my request?

    The LAMP team reads every request and brings in JLL, which leases the 550 acres it markets.

    Send your requirements

    The LAMP team reads every request and brings in the JLL team.

    Fields marked * are needed to send the form.

    Global Innovation Lab

    Apply to the Innovation Lab

    Have a technology to pilot at LAMP? Send an application. Every application is subject to review and availability.

    Start an application

    Figures describe plans and targets and can change. LAMP is an advanced manufacturing and power campus. We do not comment on the plans of individual tenants.