Skip the navigation

LAMP Industrial Cloud

Plan your industrial pilot

Use now

Preliminary, reviewed by engineering

Enter your technology, choose what it needs, explore the campus areas that could fit on a map, and get a preliminary pilot proposal. Then send it for a human engineering review.

Step 1 of 5

Your technology

Tell us what you want to test. Plain words are best.

Does the pilot involve any of these?

Ticking a box does not rule you out. It tells the safety team what to prepare.

Open rules

How the planner sorts campus areas

Simple rules on published facts only. People make every decision.

  1. Land: a parcel fits only if its published size (about, shown with ±) is at least the acres you asked for.
  2. Indoor space: a parcel fits only if its largest building shown on the published schedule is at least the square feet you asked for. This is building potential, not a finished building.
  3. Zone: each sector is matched to the published zone names (advanced technology, advanced manufacturing, industrial and support). Hazardous materials and emissions also match the industrial and support zone. This is a planning assumption, not a zoning rule.
  4. Rail and trucks: parcels near the rail line and Highway 90 on the published plan are noted as closer. The plan is not to scale.
  5. Fiber: parcels near the fiber route shown as in service on the published plan are noted. Others are on planned routes.
  6. Power and water: parcels near a planned substation or the water capture and treatment area are noted. Power is planned and water systems are under development, so engineering reviews every amount.
  7. Timing: the earliest delivery target of the parcel is compared with your preferred start month. Targets can change.
  8. Order: parcels that meet land and indoor space and match the zone come first, then the most matching notes, then the smallest parcel that meets your needs, so a pilot does not take more land than it needs.

Sources: the published Campus Explorer site plan and parcel schedule, the Innovation Lab resources, and approved LAMP infrastructure records. Readiness labels: Available now, Under development, Planned, Subject to feasibility review.

Preliminary. Not an offer. Subject to engineering review, safety approval and a signed agreement. Everything here is subject to review and availability, and to the signed agreement. Nothing on this page is an offer, a price or a date.

Innovation Lab tools

More ways to plan a pilot