Campus power, behind the meter
- Power phase 1: initial deployment: 60 MW, October 2026. Planned, projected
- Power phase 2: expansion: 240 MW, 2027. Planned, projected
- Power phase 3: scale-up: 600 to 1,000 MW or more, 2028 to 2030. Planned, projected
Industrial Infrastructure Marketplace
See what the LAMP Texas campus lists today, how ready each resource is, and when it was last verified. Then check a combined request in one step.

Resource explorer
Showing 1 of 12 resources
Available on the campus today. Service to your exact location is confirmed in the feasibility review.
Available on the campus today. Service to your exact location is confirmed in the feasibility review.
No resource matches. Clear a filter, or describe what you need in the configurator below.
Campus Explorer
Parcels, power, water, rail and roads on an interactive campus map.
One approved source
The same figures are used on every LAMP Texas page. Engineering approves each change before it is published.
| Phase | Power | Timing | Status | Verified |
|---|---|---|---|---|
| Power phase 1: initial deployment | 60 MW | October 2026 | Planned | Not yet verified |
| Power phase 2: expansion | 240 MW | 2027 | Planned | Not yet verified |
| Power phase 3: scale-up | 600 to 1,000 MW or more | 2028 to 2030 | Planned | Not yet verified |
| Power phase 4: long-term planned capacity | Up to 3 GW | 2030 and beyond | Planned | Not yet verified |
Planned figures are targets, not commitments. Power for any pilot is confirmed in a feasibility review.
Resource Configurator
Enter what your pilot or scale-up needs. You get a preliminary feasibility table based on the resources published above, and you can send it with your application.
Apply
Send one combined request with your application. The team reviews power, land, space and water together.
Already applied? Track your application.