Skip the navigation

Industrial Infrastructure Marketplace

Power, land, water and space for real pilots

See what the LAMP Texas campus lists today, how ready each resource is, and when it was last verified. Then check a combined request in one step.

A concrete pour on the LAMP Texas campus site
LAMP Texas campus, 2026

Resource explorer

Choose a category

Showing 2 of 12 resources

Data and connectivityAvailable now

Fiber connectivity

  • Fiber runs through the south entrance today
  • Northern and western entrances are planned

Phase: Today, more laterLast verified October 29, 2026

Available on the campus today. Service to your exact location is confirmed in the feasibility review.

Data and connectivitySubject to feasibility review

Site monitor and digital twin data

  • LAMP uses a site monitor and a digital twin to track construction
  • Pilot teams get separate, permissioned datasets only, never direct access to internal systems

Phase: On requestLast verified October 29, 2026

Campus Explorer

See where everything sits on the campus

Parcels, power, water, rail and roads on an interactive campus map.

One approved source

Campus power schedule

The same figures are used on every LAMP Texas page. Engineering approves each change before it is published.

PhasePowerTimingStatusVerified
Power phase 1: initial deployment60 MWOctober 2026PlannedNot yet verified
Power phase 2: expansion240 MW2027PlannedNot yet verified
Power phase 3: scale-up600 to 1,000 MW or more2028 to 2030PlannedNot yet verified
Power phase 4: long-term planned capacityUp to 3 GW2030 and beyondPlannedNot yet verified

Planned figures are targets, not commitments. Power for any pilot is confirmed in a feasibility review.

Resource Configurator

Check a combined request

Enter what your pilot or scale-up needs. You get a preliminary feasibility table based on the resources published above, and you can send it with your application.

Amounts
Connections
Other resource categories
No sign in needed. Nothing is saved.

Apply

Know what you need?

Send one combined request with your application. The team reviews power, land, space and water together.

Already applied? Track your application.

Apply to the Innovation Lab