Industrial Infrastructure Marketplace

Power, land, water and space for real pilots

See what the LAMP Texas campus lists today, how ready each resource is, and when it was last verified. Then check a combined request in one step.

A concrete pour on the LAMP Texas campus site
LAMP Texas campus, 2026

Resource explorer

Choose a category

Showing 12 of 12 resources

Power and energyPlanned

Campus power, behind the meter

  • Power phase 1: initial deployment: 60 MW, October 2026. Planned, projected
  • Power phase 2: expansion: 240 MW, 2027. Planned, projected
  • Power phase 3: scale-up: 600 to 1,000 MW or more, 2028 to 2030. Planned, projected

Phase: October 2026Not verified yet

Power and energyPlanned

Solar fields (north)

  • Two solar fields are planned on the north side of the campus

Phase: Later phasesLast verified October 29, 2026

Land and outdoor spaceSubject to feasibility review

Industrial and support parcels

  • 10 parcels, 140 acres
  • About 1,025,000 square feet of building potential

Phase: PhasedLast verified October 29, 2026

Testing and equipmentSubject to feasibility review

Active construction areas

  • Construction on the campus is active
  • All Phase 1 site, building and utility works are targeted for completion in December 2026

Phase: Phase 1 (2026)Last verified October 29, 2026

Industrial buildingsUnder development

Industrial buildings and workshops

  • Core manufacturing facilities are being built as part of Phase 1
  • The campus plans about 4,000,000 square feet of space across 19 parcels

Phase: Phase 1 and laterLast verified October 29, 2026

Data and connectivityAvailable now

Fiber connectivity

  • Fiber runs through the south entrance today
  • Northern and western entrances are planned

Phase: Today, more laterLast verified October 29, 2026

Available on the campus today. Service to your exact location is confirmed in the feasibility review.

Data and connectivitySubject to feasibility review

Site monitor and digital twin data

  • LAMP uses a site monitor and a digital twin to track construction
  • Pilot teams get separate, permissioned datasets only, never direct access to internal systems

Phase: On requestLast verified October 29, 2026

Logistics and accessAvailable now

Rail spur and truck access

  • A rail spur connects to the nearby Union Pacific line
  • Trucks reach the campus by FM 2830 and State Highway 770
  • About 40 minutes from downtown Houston, within reach of Port Houston and George Bush Intercontinental Airport

Phase: TodayLast verified October 29, 2026

Available on the campus today. Service to your exact location is confirmed in the feasibility review.

Campus Explorer

See where everything sits on the campus

Parcels, power, water, rail and roads on an interactive campus map.

One approved source

Campus power schedule

The same figures are used on every LAMP Texas page. Engineering approves each change before it is published.

PhasePowerTimingStatusVerified
Power phase 1: initial deployment60 MWOctober 2026PlannedNot yet verified
Power phase 2: expansion240 MW2027PlannedNot yet verified
Power phase 3: scale-up600 to 1,000 MW or more2028 to 2030PlannedNot yet verified
Power phase 4: long-term planned capacityUp to 3 GW2030 and beyondPlannedNot yet verified

Planned figures are targets, not commitments. Power for any pilot is confirmed in a feasibility review.

Resource Configurator

Check a combined request

Enter what your pilot or scale-up needs. You get a preliminary feasibility table based on the resources published above, and you can send it with your application.

Amounts
Connections
Other resource categories
No sign in needed. Nothing is saved.

Apply

Know what you need?

Send one combined request with your application. The team reviews power, land, space and water together.

Already applied? Track your application.

Apply to the Innovation Lab