550 of 701 acres. 4 million square feet. Exclusively through JLL.

The LAMP campus covers 701 acres. JLL has exclusive rights to 550 of them and to 4 million square feet of space, offered on ground lease or build-to-suit across 19 parcels.

Everything on this page concerns the 550 acres. For the rest of the campus, write to LAMP.

Rendering of the completed LAMP campus from the air: buildings with solar roofs, two solar fields, and the highway along the southern edgeRendering

Find your parcel

Nineteen parcels in three zones make up the 550 acres. Choose one to see its size, its building potential and its earliest delivery, or shortlist several and ask about them in one message.

Earliest delivery
Show
SSSTEC-1TEC-2TEC-3TEC-4MFG-2MFG-1MFG-3MFG-4MFG-5IND-1IND-2IND-3IND-4IND-5IND-6IND-7IND-8IND-9IND-10Solar fieldSolar fieldFuture expansionFuture expansionWater capture and treatmentRail lineU.S. Highway 90Generation plantFuture generationUtility interconnection345 kV, plannedFiber hubIn servicePlannedPlannedNatural gas pipeline
Four advanced technology parcels on the west side, five advanced manufacturing parcels in the middle, ten industrial and support parcels below them, two solar fields to the north, water capture and treatment in the south-east corner, and the rail line and Highway 90 along the southern edge.

19 parcels shown

ShortlistIntended useBuilding, share of siteMaximum coverageConstruction-readyUtilities-readyLease status
Advanced technology±32 acres235,000 SFabout 17%40%Q4 2026To be confirmedTo be confirmedAvailable for lease
Advanced technology±32 acres235,000 SFabout 17%40%Q4 2026To be confirmedTo be confirmedAvailable for lease
Advanced technology±77 acres560,000 SFabout 17%40%Q1 2027To be confirmedTo be confirmedAvailable for lease
Advanced technology±76 acres555,000 SFabout 17%40%Q1 2027To be confirmedTo be confirmedAvailable for lease
Advanced manufacturing±45 acres325,000 SFabout 17%35%Q4 2026To be confirmedTo be confirmedAvailable for lease
Advanced manufacturing±29 acres210,000 SFabout 17%35%Q4 2026To be confirmedTo be confirmedAvailable for lease
Advanced manufacturing±29 acres200,000 SFabout 16%35%Q1 2027To be confirmedTo be confirmedAvailable for lease
Advanced manufacturing±45 acres330,000 SFabout 17%35%Q1 2027To be confirmedTo be confirmedAvailable for lease
Advanced manufacturing±45 acres325,000 SFabout 17%35%Q2 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres105,000 SFabout 17%30%Q1 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres105,000 SFabout 17%30%Q1 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres105,000 SFabout 17%30%Q1 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres105,000 SFabout 17%30%Q1 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres105,000 SFabout 17%30%Q1 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres100,000 SFabout 16%30%Q2 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres100,000 SFabout 16%30%Q2 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres100,000 SFabout 16%30%Q2 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres100,000 SFabout 16%30%Q2 2027To be confirmedTo be confirmedAvailable for lease
Industrial and support±14 acres100,000 SFabout 16%30%Q2 2027To be confirmedTo be confirmedAvailable for lease

Ground lease or build-to-suit on all parcels. All parcels are owned by BaRupOn. Maximum coverage is the largest share of a parcel that buildings may cover. The largest building shown covers a smaller share: its floor area divided by the land of the parcel, rounded. The plan is an illustration redrawn from the site plan of the JLL marketing document. It is not to scale, and areas are approximate. "Available for lease" means the parcel can be leased now. It does not mean the parcel is ready to build: construction-ready and utilities-ready dates show in their own columns once published, and the earliest delivery dates are targets.

What can be delivered when

The earliest delivery of every parcel, quarter by quarter. Choose a quarter to see its parcels on the plan.

  • Advanced technology zone
  • Advanced manufacturing zone
  • Industrial and support
  1. TEC-1, ±32 acres, 235,000 SF.TEC-2, ±32 acres, 235,000 SF.MFG-1, ±45 acres, 325,000 SF.MFG-2, ±29 acres, 210,000 SF.

    138 acres4 parcels, 1,005,000 SF

    138 of 550 acres by then

  2. TEC-3, ±77 acres, 560,000 SF.TEC-4, ±76 acres, 555,000 SF.MFG-3, ±29 acres, 200,000 SF.MFG-4, ±45 acres, 330,000 SF.IND-1, ±14 acres, 105,000 SF.IND-2, ±14 acres, 105,000 SF.IND-3, ±14 acres, 105,000 SF.IND-4, ±14 acres, 105,000 SF.IND-5, ±14 acres, 105,000 SF.

    297 acres9 parcels, 2,170,000 SF

    435 of 550 acres by then

  3. MFG-5, ±45 acres, 325,000 SF.IND-6, ±14 acres, 100,000 SF.IND-7, ±14 acres, 100,000 SF.IND-8, ±14 acres, 100,000 SF.IND-9, ±14 acres, 100,000 SF.IND-10, ±14 acres, 100,000 SF.

    115 acres6 parcels, 825,000 SF

    550 of 550 acres by then

Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030.

Power, phase by phase

What the dates mean

A date in the parcel schedule is a target for one stage of a parcel. Five stages lead from land to an occupied building.

  1. 1

    Land available

    The parcel can be leased or bought, as it is.

  2. 2

    Construction-ready

    The pad is graded and accessible, ready for a building to start.

  3. 3

    Utilities at the parcel

    Power, water and fiber are brought to the edge of the parcel.

  4. 4

    Building complete

    A building on the parcel is finished and inspected.

  5. 5

    Occupancy

    The tenant moves in and starts operations.

Building figures are building potential: the largest building a parcel could hold under its maximum coverage. They are not completed or occupiable space.

Acreage schedule

How the land of the campus is counted. Lines without a figure are published once they are confirmed.

LandAcresNotes
Campus, gross land controlled701The whole LAMP campus.
Marketed by JLL, gross, 19 parcels550JLL has exclusive rights to 550 of the campus's 701 acres and to 4 million square feet of space.
Not part of JLL's assignment151The rest of the campus. Write to LAMP about it.
Net usable land by parcel
ParcelGross acresNet usable acres
TEC-1±32To be confirmed by survey
TEC-2±32To be confirmed by survey
TEC-3±77To be confirmed by survey
TEC-4±76To be confirmed by survey
MFG-1±45To be confirmed by survey
MFG-2±29To be confirmed by survey
MFG-3±29To be confirmed by survey
MFG-4±45To be confirmed by survey
MFG-5±45To be confirmed by survey
IND-1±14To be confirmed by survey
IND-2±14To be confirmed by survey
IND-3±14To be confirmed by survey
IND-4±14To be confirmed by survey
IND-5±14To be confirmed by survey
IND-6±14To be confirmed by survey
IND-7±14To be confirmed by survey
IND-8±14To be confirmed by survey
IND-9±14To be confirmed by survey
IND-10±14To be confirmed by survey

How net usable acreage is counted

Net usable land is the gross parcel area less every part that cannot carry a building. Each line is confirmed by survey before it is published.

  1. Gross parcel area, 19 parcels

    550 acres

  2. Floodplain

    Published site conditions: Flood Zone X, minimal risk. Any floodplain inside a parcel is mapped by survey.

    To be confirmed by survey

  3. Drainage and detention

    Ponds and channels that hold and carry storm water.

    To be confirmed by survey

  4. Utility and access easements

    Strips reserved for pipelines, power lines and access.

    To be confirmed by survey

  5. Infrastructure corridors

    Roads, utility corridors and generation sites of the campus.

    To be confirmed by survey

  6. Other development constraints

    Setbacks, wetlands or other limits found by survey.

    To be confirmed by survey

  7. Net usable land

    To be confirmed by survey

Gross acres are the parcel areas of the JLL schedule. Net figures leave out land that cannot be built on. All areas are approximate.

Why LAMP

The 701-acre LAMP campus is designed for companies that require reliable energy, operational scale, and supply chain proximity.

Houston metro access

Direct connection to one of the nation's largest industrial ecosystems, placing tenants at the center of manufacturing, logistics, and talent networks.

Strategic energy infrastructure

On-site power generation and long-term energy planning designed for operational resilience and industrial growth.

Logistics and transportation

Highway and rail access with proximity to the Port of Houston for efficient movement of materials and finished goods.

Advanced manufacturing focus

Built for rare earth magnet production, robotics, precision manufacturing and defense innovation.

Shared infrastructure advantage

Reduce capital costs and operate within an ecosystem where industries strengthen one another.

Ideal for

  • Advanced manufacturing
  • Advanced technology
  • Robotics
  • Rare earth magnet production
  • Precision manufacturing
  • Defense innovation
  • Industrial support

Power, phase by phase

LAMP is planned behind the meter: on-site generation serves its main operations, which limits additional demand on the regional grid. Liberty County is in the MISO South power market.

240 MW Projectedin 2027

Up to 3 GW Projectedlong-term planned capacity

  1. Phase 1

    60MW Projected

    Initial deployment

    Target online October 2026

    Natural gas generation in a combined-cycle configuration.

    Planned

  2. Phase 2

    240MW Projected

    Expansion

    Target online 2027

    Additional natural gas generation plus infrastructure.

    Planned

  3. Phase 3

    600–1,000MW+ Projected

    Scale-up

    Target online 2028 to 2030

    Further expansion and additional capacity.

    Long-term capacity

  4. Phase 4

    Up to 3GW

    Campus buildout

    Target online 2030 and beyond

    Long-term planned capacity is up to 3 GW.

    Long-term capacity

Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments.

Behind the meter, from fuel to tenant

  1. Natural gas supply
  2. Power plants
  3. Substations
  4. Campus distribution network
  5. Tenant facilities and common infrastructure

Design basis

These are design capabilities and targets of the power system. Each is verified at commissioning before it is described as performance.

Architecture

  • N+1 redundancy
  • Island-mode capable
  • Black-start capable
  • 24/7 reliability by design

Substations and transmission

  • Existing 138 kV transmission, approximately 1.15 miles from LAMP
  • 345 kV interconnection capability (future)
  • Utility interconnection, subject to final utility requirements
  • On-site substations for full campus redundancy
  • Ring-main distribution across the campus

Engineered for mission-critical operations

  • 99.999% reliability target
  • Planned behind the meter
  • Dual fuel supply path
  • Separation of critical systems
  • 24/7 monitoring and controls

Load flow and short circuit analysis completed. Infrastructure scalable and validated.

Planned capacity and status

The power plan phase by phase, with its status as LAMP publishes it. Planned capacity is a projection; firm capacity is what a signed agreement commits.

PhasePlanned capacity, campus totalTargetStatusFirm capacity
Phase 160 MW ProjectedOctober 2026PlannedSet in a signed agreement
Phase 2240 MW Projected2027PlannedSet in a signed agreement
Phase 3600 to 1,000 MW or more Projected2028 to 2030Long-term capacitySet in a signed agreement
Phase 4Up to 3 GW Projected2030 and beyondLong-term capacitySet in a signed agreement

Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments. Every figure here is planned capacity, a projection from current plans. Firm capacity, allocation and dates are set only in a signed agreement, after a technical review.

Two Phase 1 dates, two milestones

  1. October 2026

    First power

    The first 60 MW of power is targeted from October 2026.

  2. December 2026

    All Phase 1 works

    All Phase 1 site, building and utility works are targeted for completion in December 2026.

The two dates are different milestones. Both are targets.

LAMP Texas

Phase 1 power status report

60 MW, planned behind the meter

Report date
No stage date published yet
Basis
Information published by LAMP and JLL
Status
Planned

Current energization target

October 2026 (target). The first 60 MW of power is targeted from October 2026.

Completed

  • Load flow and short circuit analysis completed

Stage dates not yet published

  • Equipment procured
  • Delivered
  • Installed
  • Commissioning
  • Tested
  • Operational

Design basis, verified at commissioning

  • N+1 redundancy
  • Island-mode capable
  • Black-start capable
  • 99.999% reliability target

Grid and fuel

  • Existing 138 kV transmission, about 1.15 miles from the campus
  • 345 kV interconnection capability planned
  • 30-inch natural gas pipeline adjacent to the campus
  • 30,000 MMBtu a day of initial delivery capacity

Each stage shows its date once it is verified.

Stage by stage

The date each phase reached each stage, as LAMP publishes it once the stage is verified.

Last update No stage date published yet

  1. Phase 160 MW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  2. Phase 2240 MW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  3. Phase 3600 to 1,000 MW or more Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  4. Phase 4Up to 3 GW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published

Fuel supply, phase by phase

Natural gas is the fuel of the first phases. The supply in place today, and the plan for each later phase as it is approved.

30-inchnatural gas pipeline adjacent to the campus

30,000MMBtu a day of initial delivery capacity

  1. Pipeline
  2. Delivery point
  3. On-site generation
  4. Campus distribution
  5. Tenant facilities
  • Delivery point adjacent to the campus
  • Redundant supply options available
  • Dual gas supply paths, with on-site storage options
PhasePlanned capacity, campus totalFuel supply planContracted delivery
Phase 160 MWPublished once approvedPublished once approved
Phase 2240 MWPublished once approvedPublished once approved
Phase 3600 to 1,000 MW or morePublished once approvedPublished once approved
Phase 4Up to 3 GWPublished once approvedPublished once approved

The fuel supply of each later phase is published once its plan is approved. Contracted volumes, redundancy and added pipeline capacity are confirmed in the technical review of each phase.

Gas, water and cooling

Natural gas

30-inchKinder Morgan natural gas pipeline, adjacent to the campus

30,000MMBtu a day of initial delivery capacity

  • Delivery point adjacent to the campus
  • Redundant supply options available
  • EPA compliant, low-emission gas turbines
  • Future-ready fuels, including hydrogen-capable operation

Water

50M+gallons of planned water storage

500M+gallons a year of rainwater capture potential

  • On-site water treatment and storage
  • Multiple sources for redundancy
  • High-efficiency treatment for reuse
  • Reuse supports cooling and non-potable applications

Cooling options

  • Air-cooled
  • Closed-loop
  • Liquid cooling (future)
  • Hybrid cooling

Reuse of treated water supports cooling.

Fiber from three sides

TEC-1TEC-2TEC-3TEC-4MFG-2MFG-1MFG-3MFG-4MFG-512345678910Solar fieldSolar fieldFuture expansionFuture expansionRail lineU.S. Highway 90Fiber hubIn servicePlannedPlannedFour advanced technology parcels on the west side, five advanced manufacturing parcels in the middle, ten industrial and support parcels below them, two solar fields to the north, water capture and treatment in the south-east corner, and the rail line and Highway 90 along the southern edge.
  • Fiber in service
  • Fiber planned

The plan is an illustration redrawn from the site plan of the JLL marketing document. It is not to scale, and areas are approximate.

Multiple tier-1 providers

Access to leading national and global network providers.

Diverse fiber entrances from three sides

Fiber currently runs through the south entrance. Northern and western entrances are planned, giving the campus physically diverse paths from three sides at full buildout.

Carrier-neutral fiber facility

On site, with cross-connects.

Under 20 miles to major network routes

Direct access to backbone networks and IX points.

Low latency to major markets

Houston, Dallas, Austin, San Antonio.

Location and access

Liberty County sits within the Houston metropolitan area, putting LAMP Texas within reach of one of the largest industrial and manufacturing ecosystems in the United States.

Approximate drive times

  • 45minGeorge Bush Intercontinental Airport (IAH)
  • 40minDowntown Houston
  • 50minPort Houston, Bayport Container Terminal
  • 30–45minRegional workforce centers
  • Highway 90 adjacent
  • Rail available on site
  • Unincorporated Liberty County

Located in unincorporated Liberty County, with industrial development subject to applicable regulatory approvals.

Why Liberty

Target delivery: 10 to 14 months

Seven steps from site control to a facility ready for service, each with a target duration.

  1. Step 1

    Site control

    Completed

    • Land control secured and due diligence completed
    • Site surveys, geotech and environmental baseline complete
  2. Step 2

    Design

    2 to 3 months

    • Conceptual and schematic design
    • Utility and site design coordination
    • Equipment and layout optimization
  3. Step 3

    Permitting

    2 to 3 months

    Overlaps with design

    • Concurrent permitting with local, state and federal agencies
    • Stormwater, air quality, building permits
  4. Step 4

    Infrastructure enabling works

    2 to 4 months

    Overlaps with permitting

    • Site clearing and grading
    • Utility corridors installed
    • Roads, drainage and site utilities
    • Power, water, fiber hookup to site
  5. Step 5

    Build

    3 to 6 months

    • Building shell construction
    • MEP installation
    • Equipment delivery and installation
    • QA/QC and inspections
  6. Step 6

    Commission and turn-up

    1 to 2 months

    • Systems testing and integration
    • Power, cooling and network validation
    • Performance and reliability testing
  7. Step 7

    Operations

    Ready for service

    • Final acceptance
    • Operations team on board
    • Facility ready for service
  8. 10 to 14 monthsTarget fast-track delivery

Resilience and security

Resilience and site conditions

Flood zone
Zone X, minimal risk
Wind and hurricane
Designed for 140+ mph winds
Seismic
Low seismic risk area
FEMA maps
Available on request
Fuel and gas redundancy
Dual gas supply paths, on-site storage options, contracts for long-term reliability
Environmental and emissions
EPA compliant, low-emission gas turbines; future-ready fuels including hydrogen-capable operation

Site security

Perimeter security
Secure perimeter fencing
24/7 on-site security
Manned security, CCTV and AI monitoring
Fire protection
NFPA compliant, dedicated on-site fire station, advanced detection and suppression
Emergency response
Full-time emergency personnel, dedicated response equipment, mutual aid agreements, on-site operations center
Access and privacy
Multiple access control points, tenant isolation and privacy

Commercial structure

  • Behind-the-meter power model
  • Long-term power supply agreements (PPA)
  • Flexible structures: ground lease, build-to-suit or turnkey
  • Transparent and predictable pricing

Indicative pricing methodology: fuel index (natural gas), capital recovery, operations and maintenance, reliability premium, and tenor. Positioned as competitive long-term power pricing, with customized PPA options based on tenant needs.

Rendering of a campus building with a solar roof, truck docks and a parking lotRendering

Exclusive agent for leasing and sale

Your JLL team

Brokerage2 people

Ask LAMP about a site

Tell us what you are looking for. We read every message and bring in the JLL team.

Rendering of campus buildings and storage tanks among trees, seen from the airRendering

Fields marked * are needed to send the form.

Figures on this page come from the marketing document JLL prepared for LAMP, dated September 21, 2026. Areas, capacities and dates are approximate, describe targets and plans, and can change. Parcel names on this website can differ from the names in other documents. Renderings are for reference only.