Skip the navigation

LAMP-C018 · Open for applications

Flexible, Reconfigurable Manufacturing Cells

Advanced manufacturing. Open all year. Applications are reviewed in groups. Potential onsite pilot at LAMP Texas. Strong results may lead to a scale-up or production space conversation, subject to review and a signed agreement.

The problem

Build manufacturing cells that can switch between products in hours, not weeks, using modular machines, fixtures and software.

Why it matters

Many tenants of a large industrial campus will start small and change products often. Flexible cells let them grow without rebuilding a factory each time.

Test environment and site conditions

Pilot production space as Phase 1 buildings come online, subject to a feasibility review.

What a strong solution delivers

  • A working cell that changes over between at least two products
  • Changeover steps and times
  • Space and utility needs per cell

Evaluation metrics

  • Changeover time
  • Output per shift
  • Floor space per cell
  • Cost of a changeover

Evaluation milestones

  • Application review by the Lab team
  • Technical review and safety plan
  • Site feasibility and resource check
  • Pilot charter signed
  • Pilot run with agreed measurements
  • Results review and decision on the next step

Technical constraints

Work follows LAMP site safety rules, a written safety plan and LAMP escort rules. No access to internal control systems.

Support LAMP can offer

  • A named LAMP technical contact
  • Site induction and help with the safety plan
  • A written pilot charter if selected
  • Introductions to LAMP engineering and operations teams where it helps

Commercial opportunity

Potential onsite pilot at LAMP Texas. Strong results may lead to a scale-up or production space conversation, subject to review and a signed agreement.

Apply to the Innovation Lab