Sites for industrial equipment and energy infrastructure

Transformers, switchgear, generation equipment and heavy machinery are large and heavy, and building them takes dependable power, heavy handling and room to test. LAMP (Liberty Advanced Manufacturing and Power) is a 701-acre advanced manufacturing and power campus in Liberty County, Texas, with rail, road and on-site power planned for that work.

The building, the water tanks and rows of containers, seen from the airThe LAMP site, October 2026

701acres in Liberty County, Texas

550acres marketed by JLL, on 19 parcels

60 MW Projectedof power from October 2026

Dec 2026Phase 1 target

What equipment manufacturers need from a site

Flywheel energy storage units in a hall

Rail and heavy haul

Heavy inputs and finished equipment move best by rail and on routes built for trucks.

Power for heavy processes

Welding, machining, testing and coating lines need dependable power.

Large, open sites

High bays, laydown yards and room for outdoor storage and testing.

A port within reach

Export and import of large components through the Gulf Coast.

An energy region

Customers, suppliers and service companies across the Houston energy and industrial base.

Skilled trades

Welders, electricians, machinists and technicians from the region.

How LAMP answers each need

Each need of the industry, and what the campus plans for it today.

  1. Rail and heavy haul

    A rail spur connects to the nearby Union Pacific line. Trucks reach the campus by FM 2830 and State Highway 770.

    Rail and road
  2. Power for heavy processes

    Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030.

    Planned in phases
  3. Large, open sites

    Nineteen parcels in three zones, from about 14 to about 77 acres, on ground lease or build-to-suit.

    Through JLL
  4. A port within reach

    About 40 minutes from downtown Houston, within reach of Port Houston and George Bush Intercontinental Airport.

    Location
  5. An energy region

    The campus is planned for magnets, energy storage, additive manufacturing, drones, aerospace parts and robotics, side by side.

    Planned
  6. Skilled trades

    Local hiring is the first priority. Liberty County sits within the Houston metropolitan area.

    Regional

Every figure here is planned capacity, a projection from current plans. Firm capacity, allocation and dates are set only in a signed agreement, after a technical review.

What LAMP offers

Solar panels beside a concrete pad on the LAMP site, seen from above

Power in phases

Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030.

Rendering of the completed campus from the air, with solar panels on the roofs and in the fieldsRendering

Behind the meter

LAMP is planned behind the meter: on-site generation serves its main operations, which limits additional demand on the regional grid. Liberty County is in the MISO South power market.

Two white water storage tanks on the LAMP site, with a steel building frame behind them

Water planned first

More than 50 million gallons of planned water storage, with detention ponds and rainwater capture.

Rows of green and red containers on the site

Rail, road and port

A rail spur connects to the nearby Union Pacific line, and trucks reach the campus by FM 2830 and State Highway 770, routed away from residential streets.

Satellite map of the Houston region with LAMP Texas marked on Highway 90, between Houston and Beaumont

Near Houston

About 40 minutes from downtown Houston, within reach of Port Houston and George Bush Intercontinental Airport.

Rendering of a campus building with a solar roof and truck docksRendering

Sites through JLL

Of the campus's 701 acres, JLL has exclusive rights to 550 acres and 4 million square feet of space. Ground lease or build-to-suit, across 19 parcels.

Power, phase by phase

Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030.

  1. Phase 1

    60MW Projected

    Initial deployment

    Target online October 2026

    Natural gas generation in a combined-cycle configuration.

    Planned

  2. Phase 2

    240MW Projected

    Expansion

    Target online 2027

    Additional natural gas generation plus infrastructure.

    Planned

  3. Phase 3

    600–1,000MW+ Projected

    Scale-up

    Target online 2028 to 2030

    Further expansion and additional capacity.

    Long-term capacity

  4. Phase 4

    Up to 3GW

    Campus buildout

    Target online 2030 and beyond

    Long-term planned capacity is up to 3 GW.

    Long-term capacity

Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments.

Planned capacity and status

The power plan phase by phase, with its status as LAMP publishes it. Planned capacity is a projection; firm capacity is what a signed agreement commits.

PhasePlanned capacity, campus totalTargetStatusFirm capacity
Phase 160 MW ProjectedOctober 2026PlannedSet in a signed agreement
Phase 2240 MW Projected2027PlannedSet in a signed agreement
Phase 3600 to 1,000 MW or more Projected2028 to 2030Long-term capacitySet in a signed agreement
Phase 4Up to 3 GW Projected2030 and beyondLong-term capacitySet in a signed agreement

Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments. Every figure here is planned capacity, a projection from current plans. Firm capacity, allocation and dates are set only in a signed agreement, after a technical review.

Two Phase 1 dates, two milestones

  1. October 2026

    First power

    The first 60 MW of power is targeted from October 2026.

  2. December 2026

    All Phase 1 works

    All Phase 1 site, building and utility works are targeted for completion in December 2026.

The two dates are different milestones. Both are targets.

LAMP Texas

Phase 1 power status report

60 MW, planned behind the meter

Report date
No stage date published yet
Basis
Information published by LAMP and JLL
Status
Planned

Current energization target

October 2026 (target). The first 60 MW of power is targeted from October 2026.

Completed

  • Load flow and short circuit analysis completed

Stage dates not yet published

  • Equipment procured
  • Delivered
  • Installed
  • Commissioning
  • Tested
  • Operational

Design basis, verified at commissioning

  • N+1 redundancy
  • Island-mode capable
  • Black-start capable
  • 99.999% reliability target

Grid and fuel

  • Existing 138 kV transmission, about 1.15 miles from the campus
  • 345 kV interconnection capability planned
  • 30-inch natural gas pipeline adjacent to the campus
  • 30,000 MMBtu a day of initial delivery capacity

Each stage shows its date once it is verified.

Stage by stage

The date each phase reached each stage, as LAMP publishes it once the stage is verified.

Last update No stage date published yet

  1. Phase 160 MW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  2. Phase 2240 MW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  3. Phase 3600 to 1,000 MW or more Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
  4. Phase 4Up to 3 GW Projected

    1. Equipment procuredNot yet published
    2. DeliveredNot yet published
    3. InstalledNot yet published
    4. CommissioningNot yet published
    5. TestedNot yet published
    6. OperationalNot yet published
TEC-1TEC-2TEC-3TEC-4MFG-2MFG-1MFG-3MFG-4MFG-512345678910Solar fieldSolar fieldFuture expansionFuture expansionWater capture and treatmentRail lineU.S. Highway 90Four advanced technology parcels on the west side, five advanced manufacturing parcels in the middle, ten industrial and support parcels below them, two solar fields to the north, water capture and treatment in the south-east corner, and the rail line and Highway 90 along the southern edge.
  • Advanced manufacturing zone
  • Industrial and support

Highlighted on the plan: the zones that suit this industry. The plan is an illustration. It is not to scale, and areas are approximate.

Sites that fit

The advanced manufacturing parcels suit assembly and testing plants; the industrial and support parcels, about 14 acres each, suit yards, service and storage.

Advanced manufacturing zone

Parcels
5 (MFG-1, MFG-2, MFG-3, MFG-4, MFG-5)
Land
193 acres
Building potential
1,390,000 SF
Earliest delivery
Q4 2026

Industrial and support

Parcels
10 (IND-1 to IND-10)
Land
140 acres
Building potential
1,025,000 SF
Earliest delivery
Q1 2027

From site control to operations

A facility is targeted to be ready for service 10 to 14 months after site control, in seven steps.

Q4 2026Earliest parcel delivery in the zones that suit this industry

  1. Step 1

    Site control

    Completed

  2. Step 2

    Design

    2 to 3 months

  3. Step 3

    Permitting

    2 to 3 months

  4. Step 4

    Infrastructure enabling works

    2 to 4 months

  5. Step 5

    Build

    3 to 6 months

  6. Step 6

    Commission and turn-up

    1 to 2 months

  7. Step 7

    Operations

    Ready for service

Site selection assistant

Check your site fit

Enter what your facility needs. The assistant compares it with the planned capacity of the campus, line by line, and shows the parcels that could take it.

Questions and answers

All industries at LAMP
Is LAMP planned for industrial and energy equipment manufacturing?

Yes. Industrial equipment and energy infrastructure are among the industries LAMP is planned to serve.

Is there rail?

Yes. A rail spur connects to the nearby Union Pacific line.

How much power is available, and when?

Power is delivered in phases: 60 MW from October 2026, 240 MW in 2027 and 600 to 1,000 MW or more from 2028 to 2030.

Where does permitting stand?

LAMP is working through county and state approvals. Liberty County approved the preliminary plat in July 2026, and each permit is listed with its date as it is granted.

Is the capacity on this page committed?

No. Every figure here is planned capacity, a projection from current plans. Firm capacity, allocation and dates are set only in a signed agreement, after a technical review.

What cooling options are planned?

Air-cooled, closed-loop and hybrid cooling are in the plans, with liquid cooling as a future option. Reuse of treated water supports cooling.

Ask about a site

Tell us what you are planning. We read every message and bring in the JLL team.

Check your requirements with the site selection assistant

Fields marked * are needed to send the form.

Figures describe plans and targets and can change. LAMP is an advanced manufacturing and power campus. We do not comment on the plans of individual tenants.