Workers finishing a round concrete foundation at sunset on the LAMP site, with concrete trucks behind them

Liberty Advanced Manufacturing and Power

Where energy powers innovation.

LAMP (Liberty Advanced Manufacturing and Power) is a 701-acre advanced manufacturing and power campus in Liberty County, Texas.

NowVertical construction

All Phase 1 site, building and utility works are targeted for completion in December 2026.

LatestLAMP Texas Water Plan Centers on More Than 50 Million Gallons of On-Site Storage

LAMP Industrial Cloud Pilot Planner

Plan an industrial pilot on a working campus

A guided planner takes you from your technology to a pilot proposal and an engineering review, in plain words.

Preliminary. Not an offer. Subject to engineering review, safety approval and a signed agreement.

  1. Describe your technology

    Tell us what you want to test. Plain words are best.

  2. Enter what the pilot needs

    Power, land, indoor space, water, fiber, rail or truck access. Only what you need.

  3. Choose where on the campus

    Pick one or two areas of the published campus plan, or let engineering suggest one.

  4. Get a proposal and send it for review

    Print your preliminary proposal, or send it to the Lab team and LAMP engineering for review.

Site selection assistant

Check your site fit

Enter what your facility needs. The assistant compares it with the planned capacity of the campus, line by line, and shows the parcels that could take it.

  • Power at start and at full build-out, by year
  • Land, building area and the parcels that fit
  • Water and cooling
  • Rail, road and port
  • Delivery and timing

Large power users: start with a load

Or start with your industry

A first look, not an offer: the assistant uses LAMP's current plans and targets, which can change, and every point is confirmed with the LAMP team and JLL in a commercial and technical review.

Round tank foundations and a white water tank on the LAMP site

The campus at a glance

701 acres in Liberty County, inside the Houston metropolitan area, with power planned behind the meter.

701acres
Master-planned campus
60MW Projected
From October 2026
240MW Projected
In 2027
Up to 3GW
Long-term planned capacity

Power, phase by phase

LAMP is planned behind the meter: on-site generation serves its main operations, which limits additional demand on the regional grid. Liberty County is in the MISO South power market.

240 MW Projectedin 2027

  1. Phase 1

    60MW Projected

    Initial deployment

    Target online October 2026

    Natural gas generation in a combined-cycle configuration.

    Planned

  2. Phase 2

    240MW Projected

    Expansion

    Target online 2027

    Additional natural gas generation plus infrastructure.

    Planned

  3. Phase 3

    600–1,000MW+ Projected

    Scale-up

    Target online 2028 to 2030

    Further expansion and additional capacity.

    Long-term capacity

  4. Phase 4

    Up to 3GW

    Campus buildout

    Target online 2030 and beyond

    Long-term planned capacity is up to 3 GW.

    Long-term capacity

Each figure is the total planned capacity of the campus in that period, not an addition to the phase before. Targets are not firm commitments.

Infrastructure planned first

LAMP Texas integrates power, water, and utility infrastructure to support long-term industrial operations while reducing demand on public resources.

Infrastructure in detail
Solar panels beside a concrete pad on the LAMP site, seen from above

Power

Behind the meter

60 MW Projectedfrom October 2026240 MW Projectedin 2027Up to 3 GW Projectedplanned long term
Two white water storage tanks on the LAMP site, with a steel building frame behind them

Water

50M+gallons of planned water storage

Planned storage, with detention ponds and rainwater capture.

  • Natural gasAdjacent 30-inch natural gas pipeline. 30,000 MMBtu a day initial delivery capacity.
  • FiberMultiple tier-1 providers, with entrances from three sides at full buildout.
A large steel-framed building with a finished white roof and a crane beside it, seen from above

Delivery

Target delivery: 10 to 14 months

Seven steps from site control to a facility ready for service, each with a target duration.

See the seven steps

The right place. The right time.

Liberty County sits within the Houston metropolitan area, putting LAMP Texas within reach of one of the largest industrial and manufacturing ecosystems in the United States.

Approximate drive times

  • 45minGeorge Bush Intercontinental Airport (IAH)
  • 40minDowntown Houston
  • 50minPort Houston, Bayport Container Terminal
  • 30–45minRegional workforce centers
  • Highway 90 adjacent
  • Rail available on site
  • Unincorporated Liberty County

Located in unincorporated Liberty County, with industrial development subject to applicable regulatory approvals.

Why Liberty

Built here. For here.

LAMP Texas is committed to building lasting value with Liberty County, not just within it.

Community development
Four people standing in front of a white and red emergency vehicle

Emergency services

Company-funded fire station, emergency response infrastructure, and support for both the LAMP campus and surrounding community.

Supporting a safer community
Workers in hard hats and safety vests at the base of a water tank, beside a compact loader

STEM programs

Supporting future talent through STEM education, workforce readiness, and industry partnerships.

The STEM program
Two workers in hard hats and safety vests setting steel on a foundation

Local hiring and workforce development

Creating long-term employment opportunities through workforce development, skilled trades, and advanced manufacturing careers.

Hiring local

LAMP will not make commitments it cannot keep.

For contractors, suppliers and service firms

$3 billion+

planned investment at full build-out, across all trades

LAMP buys from contractors, suppliers and service firms in every trade, and gives local businesses priority consideration.

What the campus buys

  • General contracting
  • Site work and earthwork
  • Concrete
  • Structural steel
  • Mechanical and piping
  • Electrical
  • Plumbing and HVAC
  • Roofing and finishes
  • Engineering and surveying
  • Testing and inspection
  • Environmental and permitting
  • Materials supply
  • Equipment rental and cranes
  • Trucking and hauling
  • Fuel, water and temporary power
  • Site services and security

LAMP never charges a fee to register or to respond to a request.

Workers and an excavator on a round foundation, seen from above

Construction progress

Follow the latest construction milestones, infrastructure improvements, and development activity across the campus.

Photos as of October 2, 2026